poly_ensuite

Bathroom Waterproofing

Observe – Review plans for layout and shower sizes. Flanges installed, shower rose and taps / mixers enough area for waterproof seal.
 
Prepare – Clean area free of dust and debris.
 
Apply – Install water bar / stops, door angles,  waterproofing membranes and sealants.
 
Conclusion – Removal of rubbish, working areas cleaned, documented report of completed works.

Application Process

Bathroom Waterproofing – Application can take up to 2 – 3 days, depending on how large the project as it may take longer. We will prepare area before applying polyurethane membrane system to internal wet areas. Use joint sealant / joint fillet on all wall / floor joints, nail / screw heads and flanges. (Depending on floor substrate 2 part epoxy primer). Apply 2 coats of polyurethane membrane. Apply acrylic coat to shower walls and wall penetrations.

Features

  • 2 to 3 day application process
  • 24 hours drying time
  • Strong
  • Long Lasting
  • Seamless
  • Durable

Products Required

  • 2 part Epoxy Primer
  • 2 coats of Polyurethane Membrane
  • Joint Sealant
  • Acrylic Membrane for shower / bath walls
  • Plastic angle (water stop)
  • Aluminium angle (door angle)

Shower Niche

A shower niche is also called a shower recess, this is a nice feature to store shower cosmetics for skin and hair care;

2 part Epoxy Primer

Installed angles, application of joint sealant, 2 part hi build epoxy primer, soft acrylic membrane on shower walls and tap penetrations.

1st Coat Polyurethane Membrane

Application of polyurethane membrane and soft acrylic membrane on shower walls and tap penetrations.