Project Description

Observe – Ensuring flanges are installed correctly, fall on balcony to floor waste or open edge balcony.

Prepare – Clean area free of debris.

Apply – Waterproofing membranes and sealants.

Conclusion – Removal of rubbish, working areas are cleaned, documented report of completed works.

Application Process

Application can take up to 3 to 4 days (weather pending). We will prepare area before applying waterproofing membrane, apply an epoxy primer on substrate to neutralise balcony surface area. Use of joint sealant on all wall / floor joints, nail / screw heads and flanges (ensuring penetration flanges are installed correctly). Apply 2 x coats of a polyurethane membrane to waterproof balcony.

Features

  • Flexable
  • Single Component
  • Seamless
  • Durable
  • Easy to apply

Products Required

  • Epoxy Primer
  • Polyurethane Membrane
  • Joint Sealant
  • Joint Fillet (optional if needed)
  • Acrylic (optional)
  • Plastic angle (optional)
  • Aluminium dress edge angle (optional)

Completed Balcony

A completed view of a 2nd coat to a polyurethane membrane coated balcony.

Epoxy coated balcony

2 part epoxy primer used on all balconies.

2 x Coats of Polyurethane Membrane

Use of joint sealant on all edges along door seal and / or trim to waterproof in balcony door, 2 x coat of polyurethane membrane.